In the event of a coil failure, Sunbelt fully inspects your transformer to determine winding material and to quote a cost. From there, our skilled technicians will:

  • Disassemble the coil
  • Reverse engineer to determine coil size, voltage, and kVA
  • Design, wind, and install the new coil
  • Perform a full electrical test
  • Recondition your transformer, including bushings, gauges, and cabinet down to a new coat of paint

Coil rewinds are more time-efficient, with lead times as quick as four to six weeks, compared to the 14 to 16 weeks it takes to build new. It also provides a more turnkey re-installation process with NO added work at your jobsite.

Coil rewind is also ideal for off-the-shelf retrofits.