PROVEN POWER EQUIPMENT.

REBUILT TO THE HIGHEST STANDARDS

 

Ensuring both electrical and mechanical components perform at their peak we deploy a process that includes, but is not limited to:

- Gaskets are replaced for all components including bushings, gauges, hand/man holes, and radiators.

- All pipe fittings are resealed with Teflon tape and/or pipe sealant.

- Switches, fuses, gauges, and other components are inspected, tested and replaced if needed.

- Transformer fluids are tested and processed or replaced - Sunbelt-Solomon Solutions is an Authorized Service Center for Envirotemp FR3 dielectric fluids.

- Full testing is conducted including:

  • TTR
  • Megger
  • HV and LV Winding Resistance
  • Phase Polarity
  • Impedance
  • No Load and Load Loss Testing
  • Oil Dielectric
  • Pressure Testing
  •  DOBLE Testing (upon request)

- All Transformers are painted with a high-quality industrial finish. Custom finishes available.

- Final quality check performed prior to shipping.